Skip to content
Menu
About us
Products
Power Quality
Active Harmonic Filter
Static Var Generator
Voltage Optimization
Uninterrupted Power Supply
Power Quality Mobile Anlayser
HVAC System
Heat Pumps System
Adsorption Chiller
Air Purifiers / Smoke Filters
Automation
BMS Servers & Controllers
Sensors
Power Supply
Smart Meters
EV Chargers
360~480kW Distributed Charger
SEC 200-240kW Integrated Charger
SEC 60-160kW Integrated Charger
SEC 40-80kW Integrated Charger
Interstellar AC Charger
Mira AC Charger
Solutions
Power Quality Audits
Power Quality Solutions
Hvac Optimization
Automation Solutions
Indoor Air Quality Improvement
Smart Metering & Lighting
Services
Energy Audit
PQ Audit and Measurement
Harmonic Studies
Harmonic Simulation Studies
PQ Equipment Rental
Sectors
Hospitality
Industrial Plants
Data Centres / Telecom
Commercial Facilities
Cooling Plants
Contact us
Search for:
Search
X
Burj Al Arab, Jumeirah Group, Dubai (2021)
Migration & Upgrade of Existing Pool Control to Simatic WinCC
Key findings:
Existing control system (Honeywell, Wago) is defective and allowing manual control only.
No automatic function for filter backwash and filter pumps (duty and standby).
50% of all sensors are defective and/or providing inconsistent readings.
Actual controller provided by HMI panels with limited functionality and no SCADA integration.
Improvement Workplan
2024 Copyright © Energy Savers Technical Services LLC. All Right Reserved. Powered by
JF
Open chat
Powered by
Joinchat
Hello 👋
Can we help you?
Call Now Button